We have Moved In
Since then we have been busy both inside and out. The decorating has all been finished apart from one or two things that need touching up, I have made curtains for the spare bedrooms and bathroom. Landscaping is completed outside ready for the gravel to arrive for the drive tomorrow. There are still a few problems to sort however, the tiler made a mess of the wet room floor and it did not drain towards the drain, we have decided to cut our loses and sink a large showertray into that area, partly because we could not find another tiler to rectify it and partly because it an easy way out of the problem. Actually it may well prove to be more successful as there will be no worries about cracked grouting causing leaks down into the lounge!
Phil is now busy putting down the decking round the front of the house. The ground gets so wet we thought this would be the best way of keeping the area round the house less damp! It will be wonderfull sitting out there with our Gin and Tonics on a balmy summer evening fighting off the midges!
Our lounge sofas arrive on Wednesday and then we can chose lamps, coffee tables and other finishing touches to finish everything off.
Within the next month we rather hope that life will get back to nor
mal and the old routine. Phil working on Old Pines, and me setting up life here in Spean Bridge. The last two and half years have been very stressful, we are not over it all yet - we are still struggling to get someone to do this test on the drains without which we cannot complete and put an end to building our own home but we are nearly there and I am sure then we can get back to a normal life and have more time to do and see more of Scotland and have time to visit all our old friends again.

