WEEK 32 - FLOODED OUT!
What a week. Wind, gales, heavy rain and we are water logged. It is impossible to take any photos as the weather is far too bad. Jim has been struggling with the rendering and amazingly has managed to get the back and the side gable done. However the front is proving to be a battle as it faces the prevailing wind and rain, will not dry out and when he did do the pillars either side of the cathedral window it blew off! However the scaffolding came down at the back and side on Friday so all is left is the front and from the rear the house is looking good- if you can get round to see it!.
The land at the back is taking shape especially since Donald came back on site and has been doing a lot of ground work and bringing it up to level in his infamous way. He has also levelled off the front and both Ken and Phil picked a dry day to clear up and have a huge bonfire.
The electric cable is almost in place so we are hoping that the electricity board will be able to get here during this week. However as we have been having numerous electricity cuts they must be being kept busy elsewhere.
I am going to close this week and hope to write of more progress next week.
The land at the back is taking shape especially since Donald came back on site and has been doing a lot of ground work and bringing it up to level in his infamous way. He has also levelled off the front and both Ken and Phil picked a dry day to clear up and have a huge bonfire.
The electric cable is almost in place so we are hoping that the electricity board will be able to get here during this week. However as we have been having numerous electricity cuts they must be being kept busy elsewhere.
I am going to close this week and hope to write of more progress next week.